Break From The Office With Work At The River
Today I took another much needed break from office/computer work to work up the street at the River.
Yesterday I returned to work on one of the many ongoing projects there, picking up this time from where I’d left off before Lee was born in January: the floor installation. So yesterday I hand-carried a truck full of white pine tonge-and-groove flooring half an acre or so to the job site, since I couldn’t drive on the wet, soft ground. I got the job site prepped for installation, my workstation organized and installed my first few pieces, then called it a day. It was a short day at only three hours, but a very busy one.

Today I got in a decent amount of work in only five hours, installing up to nearly 3/4 quarters of the flooring. I also helped Tim install the main, front window, which was really nice as it really brightens the room and makes working amidst stone and block that much better.

Tomorrow, time permitting, I’ll be back to finish the flooring installation. Then it’s on to finishing the window and door installations, the ceiling, the interior wall, wiring, heating, and some other odds and ends.

2009, building, carpentry, construction, daily log, green building, lee, outdoors, the river, work